Cookies in IBERCISA
We use own and third party cookies to improve your experience and our services, analyzing browsing on our website. The Cookies will not be used to collect personal information.
You can get more information on our Cookies policy.
I Accept
Aftersales: sat@ibercisa.es
+34 986 213 900
BAC Cantabria
OWNER
Spanish Navy (Spa)
EQUIPMENT
Navy winch package
More info
Ins Shatki & Ins Deepak
OWNER
Indian Navy (India)
EQUIPMENT
Navy winch package
More info
Conqurer, Glory Victory & Pride
OWNER
Iraqui Navy (Iraq)
EQUIPMENT
Navy winch package
More info
BAC Cantabria
AUXILIARY OILER REPLENISHMENT (AOR) Vessel: BAC Cantabria
Length: 174 m
Owner: Spanish Navy (Spa)
Shipyard: Navantia (Spa)
Delivery: 2010
IBERCISA EQUIPMENT2 x Hydraulic Anchor Windlasses:
- Capacities:
  - Chain lifter: chain Ø64 mm
  - Working head: Ø750 mm
- Pulls and speeds:
  First Speed
  - Chain-lifter: 22,7 t - 12 m/min
  - Working head: - / -
  Second Speed
  - Chain-lifter: - / -
  - Working head: 11,4 t - 24 m/min
- Pressure and oil flow required: 210 bar; 160 l/min
- Maximum pull (2’): 1,5 x nominal pull (315 bar)
IBERCISA EQUIPMENT2 x Hydraulic Capstans:
- Warping head diammeter: Ø530 mm
- Pulls and nominal speeds: Ø450 mm
  - First Speed: 10,0 t; 15 m/min
  - Second Speed: 5,0 t; 30 m/min
- Hydraulic brake capacity: 1,5 x nominal pull.OTHER EQUIPMENT2 x Hydraulic Driving Equipment and Controls:
- Capstans: Pressure and oil flow required: 210 bar; 85 l/min
- Anchor Windlasses: Pressure and oil flow required: 210 bar; 160 l/min
Ins Shatki & Ins Deepak
AUXILIARY OILER REPLENISHMENT (AOR) Vessel: Ins Shatki & Ins Deepak
Length: 175 m
Owner: Indian Navy (India)
Shipyard: Ficantieri (Italy)
Delivery: 2009
ANCHORING & MOORING PACKAGE2 x Anchor & Mooring Windlass:
- Capacities:
  - Chain-lifter: Ø 64 mm. U3 chain
  - Drum (split -working & storage zones) 240 m. Ø 68 mm. (pp rope)
  - Warping end:. Ø 530 mm
- Nominal line pull and speed at:
  First Speed
  - Chain-lifter: 29,0 t ; 0 - 9 m/min
  - Drum 1st layer: 15,3 t ; 0 - 18 m/min
  Second Speed
  - Chain-lifter: 11,0 t ; 0 - 23 m/min
  - Drum 1st layer: 6,0 t ; 0 - 44 m/min
- Working pressure and oil flow required at chain-lifter: 220 bar; 150 l/min
- Remark: Both speeds (1st and 2nd) are completely variable stepless, controlled by the electric joystick from control console.
- 2 x Roller Chain Stoppers for 64 mm chain
- 1 x Hydraulic Power Pack
ANCHOR & MOORING WINCHES PACKAGE2 x Hydraulic Capstan:
- Warping end diameter: Ø 530 mm
- Pull and Nominal speed:
  - First Speed: 15 t ; 15 m/min
  - Second Speed: 7 t ; 30 m/min
- Working pressure and oil flow required: 250 bar; 125 l/min
- Remark: With the hydraulic motor at minimum capacity, the 2nd speed (with 125 l/min) can get until 75 m/min working at bare (without load).
- 1 x Hydraulic Power Pack for Mooring Capstans
- 1 x Hydraulic Power Pack for Anchor/Mooring Windlass
Conqurer, Glory Victory & Pride
SAETTIA PATROL SHIPS Vessel: Conqurer, Glory Victory & Pride
Length: 52.80 m
Owner: Iraqui Navy (Iraq)
Shipyard: Ficantieri (Italy)
Delivery: 2008
IBERCISA EQUIPMENT1 x Vertical Electric Anchor Winch:
- Capacities:
  - Chain-lifter: Ø16 mm. U3 chain
  - Warping end: Ø235 mm
- Nominal line pull and speed at:
  First Speed
  - Chain-lifter: 2,8 t ; 8 m/min
  - Warping end: 2,4 t ; 10 m/min
  Second Speed
  - Chain-lifter: 2,6 t ; 16 m/min
  - Warping end: 2,0 t ; 20 m/min
- Max. line pull (2’): 1,5 x nominal pull
2 x Electric Capstan:
- Warping end diameter: Ø235 mm
- Nominal line pull and speed:
  - First Speed: 2,2 t; 10 m/min
  - Second Speed: 2,0 t; 20 m/min
IBERCISA EQUIPMENT1 x Vertical Electric Anchor Winch:
- Drum capacity: 20 m. Ø26 mm. (wire)
- Nominal line pull and speed at:
  Nominal power
  - Drum 1st layer : 6,0 t; 0 - 13 m/min
  - Drum 2nd layer: 25,5 t; 0 - 14 m/min
  40% overload
  - Drum 1st layer: 8,4 t ; 0- 23 m/min
  - Drum 2nd layer: 7,7 t ; 0- 25 m/min

- Remark: With the winch controlled by means of a frequency converter can be obtained pulls 40 % higher than the nominal ones and variable speeds between 0 and 80 % superior than the nominal ones.
 
Juan Carlos I
OWNER
Spanish Navy (Spa)
EQUIPMENT
Navy winch package
More info
Anna Kakurukaze Mungunda
OWNER
Ministry Fisheries (Rep. Namibia)
EQUIPMENT
Navy winch package
More info
F101 - F105
OWNER
Spanish Navy (Spa)
EQUIPMENT
Navy winch package
More info
Juan Carlos I
LANDING HELICOPTER DOCK (LHD) Vessel: Juan Carlos I
Length: 230.82 m
Owner: Spanish Navy (Spa)
Shipyard: Navantia (Spa)
Delivery: 2006
ANCHORING & MOORING PACKAGE3 x Hydraulic Mooring winches:
- Capacities:
  - Drum: 200 m. Ø 80 mm. (rope pp.)
  - Warping - head: Ø 750 mm
- Pull and nominal speed:
  First Speed
  - First layer drum: 16,0 t ; 15 m/min
  - Warping - head: 17,0 t ; 14 m/min
  Second Speed
  - First layer drum: 8,0 t ; 30 m/min
  - Warping - head: 8,5 t ; 28 m/min
Static brake: 95 t
OTHER EQUIPMENT2 x Hydraulic Driving Equipment and Controls:
- Pressure and oil flow required: 200 bar ; 165 l/min.
2 x Electric Capstans · 45 kW:
- Warping head diammeter: Ø 900 mm.
- Pull and Nominal speed:
  - First Speed: 16,0 t ; 15 m/min
  - Second Speed: 8,0 t ; 30 m/min
2 x Hydraulic Anchor Windlass:
- Capacities:
  - Chain lifter: chain Ø 100 mm. U3.
  - Drum: 200 m. Ø 80 mm. (rope pp.)
  - Warping - head: Ø 750 mm.
- Pull and nominal speed:
  - Chain lifter:
    65,0 t ; 0 - 11,5 m/min
  - First layer drum:
    16,0 t ; 0 - 45,0 m/min
  - Warping - head:
    17,0 t ; 0 - 42,0 m/minOTHER EQUIPMENT1 x Hydraulic Driving Equipment and Controls:
- Pressure and oil flow required: 200 bar ; 490 l/min
- Chain lifter (2’): 1,5 x nominal pull ( 300 bar )
- Static brake chain lifter: 324 t
- Static brake capacity: 95 t
2 x Chain stooper ø 100 mm. U3
 
Anna Kakurukaze Mungunda
FISHERIES PATROL Vessel: Anna Kakurukaze Mungunda
Length: 59 m
Owner: Ministry Fisheries (Rep. Namibia)
Shipyard: Freire (Spa)
Delivery: 2003
IBERCISA EQUIPMENTHydraulic Anchor Winches:
- Warping head diammeter: Ø430 mm.
  - Chain diameter: Ø34 mm
  - Nominal Pull: 5,5 t
  - Nominal Speed: 10 m/min
- Pressure and flow required: 140 bar; 60 l/min.

Hydraulic Capstan:
- Warping end diameter: Ø320 mm
- Nominal Pull and speed: 5 t; 15 m/min
- Pressure and flow required: 225 bar; 50 l/min.
IBERCISA EQUIPMENTHydraulic Towing Winch:
- Drum capacity: 500 m. Ø40 mm (wire) + 75 m Ø80 mm (rope)
- Warping end diameter: Ø450 mm
- Nominal Pull and speed (drum 1st layer): 25 t; 22 m/min
- Nominal Pull and speed (full drum): 10 t; 55 m/min
- Pressure and flow required: 250 bar; 315 l/min.
F101 - F105
FRIGATE Vessel: F101 - F105
Length: 146.72 m
Owner: Spanish Navy (Spa)
Shipyard: Navantia (Spa)
Delivery: 1999 - 2001
IBERCISA EQUIPMENT2 x Electric Capstans · 7.5 kW
- Warping head diammeter: Ø 320 mm.
- Pull and Nominal speed:
  - First Speed: 0,5 t ; 60 m/min
  - Second Speed: 0,6 t ; 30 m/min
 
Galicia
OWNER
Spanish Navy
EQUIPMENT
Winches packages
More info

IBERCISA Deck Machinery


Estrada Muíños 25
36213 Vigo - España
Telf: +34 986 213 900
Fax: +34 986 202 779
E-mail: ibercisa@ibercisa.es
After sales: sat@ibercisa.es

CONNECT WITH US


STAY IN TOUCH